<pre id="7vhrb"></pre>

        <listing id="7vhrb"></listing>
        <dfn id="7vhrb"><progress id="7vhrb"></progress></dfn>

        <p id="7vhrb"></p>

            <progress id="7vhrb"></progress>
            <track id="7vhrb"><span id="7vhrb"><th id="7vhrb"></th></span></track>
            <big id="7vhrb"><th id="7vhrb"><progress id="7vhrb"></progress></th></big>
              Homepage      Favorite      中文版
            Home About Us News info Products Services Recruitment Contact us
            SERVICES
            Marketing
            After Services
            Question
            Downloads
            CONTACT US
            Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
            Tel: +86-592-6539999
            E-mail: bussiness@xmzzj.com

            After Services
            Location:Home → Services → After Services

            Wheel Loader
            To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "since the date of the sale of the machine within 12 months" or "the machine is running 2400 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "third strong security, "loader running 1200 hours, or 5-6 months;" fourth strong guarantee "loader running 1800 hours, or 8-9 months;" fifth strong protection ", loaders run 2400 hours, or 11-12 months.

            Excavator
            To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the excavator, "since the date of the sale of the machine within 12 months" or "length of time the machine is running 2000 hours of" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong security," excavator run about 100 hours or 10 days; "second strong security," excavator 500 hours or 2-3 months; "third strong security, "excavator running 1000 hours, or 5-6 months;" fourth strong security, "excavator running 1500 hours, or 8-9 months;" fifth strong security, "excavator operation 2000 hours, or 11-12 months.

            Block Handling Wheel Loader
            To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "from the date of sale of machines within six months" or "the machine is running 1200 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform three mandatory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "section three strong security, "loader running 1200 hours, or 5-6 months.


            About Us
            Company profile
            Culture
            Organizational
            Development
            Subsidiaries
            Certificates
            Products
            Wheel Loader
            Block Handling Wheel Loader
            Excavator
            Other
            Spare Parts
            News
            Company News
            Trade News
            Exhibitions
            Videos
            Services
            Marketing
            After Services
            Question
            Downloads
            Recruitment
            Talent Concept
            Jobs
            Contact Us
            Feedback
            Contact us
            Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
            Two-dimensional [Close]

            點擊這里給我發消息
            點擊這里給我發消息
            国产欧美日韩专区毛茸茸,最新狠狠色狠狠色综合,欧美图片一区,欧美一区二区不卡视频

            <pre id="7vhrb"></pre>

                  <listing id="7vhrb"></listing>
                  <dfn id="7vhrb"><progress id="7vhrb"></progress></dfn>

                  <p id="7vhrb"></p>

                      <progress id="7vhrb"></progress>
                      <track id="7vhrb"><span id="7vhrb"><th id="7vhrb"></th></span></track>
                      <big id="7vhrb"><th id="7vhrb"><progress id="7vhrb"></progress></th></big>